A first glimpse of the loading |
|
|
Preparation for unloading |
|
|
A hemisphere, still packed |
|
|
|
|
|
|
The racks are already in the antechamber. |
|
|
|
|
|
|
|
|
|
the second one must also come down, |
|
|
but with the special rack it is quite easy! |
|
|
|
|
it gets down to the ground. |
|
|
|
High steps needed to be overcome. |
|
|
Unloading is finished now. |
|
|
|
|
First the ceiling rack is installed again. |
|
|
|
The ceiling gets closer... |
|
|
|
|
The last centimeters up to the ceiling |
|
|
now just for some aligning. |
|
|
The holes for the pegs are bored With the drilling hammer. |
|
|
|
Afterwards the rack is immersed in the water. |
|
|
The rails to open the spheres are next. |
|
|
The ceiling rack is hanging! |
|
|
Now it's the sphere racks' turn. |
|
|
|
First insert the moving part. |
|
|
Only very small tolerances are permissible. |
|
|
|
|
|
Now make up the second rack. |
|
|
|
And on every of the four corners... |
|
|
... screw them together well. |
|
|
|
Then tackle the assembly... |
|
|
... of the drive quickly to open the sphere. |
|
|
Now the assembly of the sphere begins. |
|
|
At the beginning there's the unpacking. |
|
|
|
No transport damage is present. |
|
|
Preparation for the installation. |
|
|
The hemisphere moves upwards. |
|
|
The first glance into the inside of the hemisphere. |
|
|
|
|
|
Be careful with the port plate. |
|
|
The first hemisphere is almost up and above. |
|
|
|
The first hemisphere is in its rack. |
|
|
The second hemisphere is brought into the hall. |
|
|
The protective plastic film is removed as well. |
|
|
After lifting it off the film may be removed. |
|
|
|
Now the raising to its final position commences. |
|
|
The second hemisphere is hanging. For the first time its
dimension
becomes obvious. |
|
|
The suspension in the detail |
|
|
Dr. Groebel proudly between his work. |
|
|
|
First closing of the spherel |
|
|
|
|
The sphere is closed shut. The end of a long working day. |
|
|
|
Relieving the suspension for the adjustment of the sphere. |
|
|
The rear suspension for angular compensation |
|
|
The adjustment is finished and fixed. |
|
|
The rear limit switch is connected. |
|
|
|
The strut insert for angular adjustment. |
|
|
The front limit switch is connnected. |
|
|
|
|
|
Small transport damages are eliminated. |
|
|
And the flange is cleaned. |
|
|
The coating is examined thoroughly. |
|
|
Small damages are immediately repaired. |
|
|
|
The sealing tape is put on the flange plate. |
|
|
The color for the coating is prepared. |
|
|
And afterwards varnished. |
|
|
One further final coating will take place after the introduction
of the
air condition technology in the building |
|
|
|
The coating in the "high speed drying" |
|
|
The varnishing gets its final colour: |
|
|
|